Build Diary
February 2008


No specific dates

Sorted out the brake pedal.  Motorcycle master cylinder uses an M8 thread, and that is one of the two taps that I have.  So  it wasn't difficult to make a clevis extender (this threads onto the master cylinder and bolts onto the old clevis) out of a section of 1/2 inch square brass.  Basically it brings the clutch pedal forwards.  Not rocket science but all in the right direction.


The rest of the month and much of March was taken up with a new project.  I have managed to buy a bit of garden from the neighbours (who are moving) so needed to fence that off, and then I needed to sort out the old boundary.  Also while I had a digger I put a trench in for power to the new garage (this is a virtual garage at the moment).  Anyway this whole project was 6 weekends of effort.  Sorry for the lack of progress.



Go to Next Month

Back to Index